ComplianceOnline
Best Practices Best Practices
Online Training Online Training
Seminar Seminar
Standards
Welcome,
Guest
Free Registration | Sign In
ComplianceOnline Home > ComplianceOnline Standards
 
 Browse Category
 
    Aerospace
    Agriculture and Farm Machinery
    Automotive, Aircraft & Marine technology
    Banking, Corp. finance & Sox
    Biotech & Pharmaceutical Standards
    Chemical technology
    Civil engineering and construction
    Computer Hardware
    Electrical Engineering
    Electronic Equipment
    Energy and Heat Transfer Engineering
    Environment & Health protection
    FDA Audit, Validation & Documentation
    Food Technology
    GXP Compliance Tools New
    HIPAA Compliance
    Human Resource
    Industry Reports New
    ISO Published Standards
    IT and PCI Compliance
    Leather and Textile
    Manufacturing Engineering
    Medical Device and Healthcare Technology
    Metal, Mining and Minerals
    Packaging and Distribution
    Paper and Plastic Industries
    Petroleum products
    Quality Terminologies & Documentations
    Safety Engineering
    Test Methods & Procedures
    Trade Supply Chain and Logistics
 
Defines suitable metrics for use in improvement projects
Provider: Quality-Control-Plan
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price: $57.00

Product Detail:

Defines suitable metrics for use in improvement projects

  1. The act or process of quantitatively comparing results to requirements to arrive at a quantitative estimate of performance.
  2. Trend and control charts accumulate data over time so they are more than a snapshot of events but they are still not data that meets the attributes of a metric.
  3. The chart has value because it identifies the <few> from the <many> but it is not a metric by itself unless it is tied to an objective.

It Provides information on:

  1. Continuous Improvement Metrics
    • Objectives.
    • Overview.
    • Tools.
    • Attributes of Metric.
Customer Testimonials
This product hasn't been reviewed yet.
Review this product
 
 Member Service
 
Toll Free  +1-888-717-2436
Fax  +1-650-963-2556
Email  editor@complianceonline.com
 
 Your Shopping Cart
Contains 0 items    Total: $0.00
Customers Also Bought
Tolerances for building -- Part 7 : General principles for approval criteria, control of conformity with dimensional tolerance specifications and statistical control -- Method 2 (Statistical control method)'
Price: $92
 
Rubber, vulcanized and thermoplastic - Preformed gaskets used in buildings - Classification, specifications and test methods
Price: $98
 
Measurement of water flow in fully charged closed conduits - Meters for cold potable water and hot water - Part 3: Test methods and equipment
Price: $180
 
Measurement methods for building -- Setting-out and measurement -- Part 1: Planning and organization, measuring procedures, acceptance criteria'
Price: $104
 
Measurement methods for building -- Setting-out and measurement -- Part 2: Measuring stations and targets
Price: $116
 
Measurement methods for building -- Setting-out and measurement -- Part 3: Check-lists for the procurement of surveys and measurement services
Price: $49
 
Related Trainings
Water System Mythology: Common False Beliefs for Microbial Control and Monitorin...
 
The Hero of Manufacturing Contamination Control -- The Microbiology Lab
 
Managing Immunogenicity Risk in Biopharmaceuticals
 
Supplier Qualification and Oversight: How to Cope with a Global Supply Chain
 
Products from the same family
MIL-Q-9858A Survey
Price: $77
 
MSDS - Material Safety Data Sheet
Price: $17
 
MSDS - ANSI Z400.1 Rev 2004
Price: $17
 
Nonconformance Disposition Procedure
Price: $77
 
Nonconformance Disposition Kit
Price: $97