Provider: Quality-Control-Plan Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price: $57.00
Product Detail:
The purpose of the Manufacturing Readiness Review ( MRR ) is to demonstrate the overall production readiness of a supplier and assure that the items to be manufactured will meet the requirements of the Statement of Work and engineering drawings.
This procedure shall apply to all in-house production and outside subcontractors/suppliers that fabricate and/or assemble deliverable hardware.
The MRR proceedings shall be scheduled to coincide with the completion of the manufacturing planners/travelers and production tool design drawings.