ComplianceOnline
News
Best Practices
Compliance Training
Store
Q&A
BII
Welcome,
Guest
Free Registration | Sign In
ComplianceOnline Home > ComplianceOnline Store
 
 Browse Category
 
    Aerospace
    Agriculture and Farm Machinery
    Automotive, Aircraft & Marine technology
    Banking, Corp. finance & Sox
    Biotech & Pharmaceutical Standards
    Chemical technology
    Civil engineering and construction
    Computer Hardware
    Electrical Engineering
    Electronic Equipment
    Energy and Heat Transfer Engineering
    Environment & Health protection
    FDA Audit, Validation & Documentation
    Food Technology
    GXP Compliance Tools New
    HIPAA Compliance
    Human Resource
    Industry Reports New
    ISO Published Standards
    IT and PCI Compliance
    Leather and Textile
    Manufacturing Engineering
    Medical Device and Healthcare Technology
    Metal, Mining and Minerals
    Packaging and Distribution
    Paper and Plastic Industries
    Petroleum products
    Quality Terminologies & Documentations
    Safety Engineering
    Test Methods & Procedures
    Trade Supply Chain and Logistics
 
View Sample Pages
Poorly developed software could have ten times as many defects as well engineered software. As with other products, quality has to be built in. If the software is of poor quality, validation testing is not going to make it function properly. This checklist is a form for conducting an on-site audit of a software vendor's quality system, and software development and support processes. It can be used to determine if the vendor has built the software you intend to purchase with the software development practices associated with quality software and recommended in the FDA guidance document on computer system validation. 44 pages
Provider: BPA
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price: $195.00

Product Detail:
  • The purpose of this work instruction is to provide an audit checklist for auditing computer system software as recommended in VAL007.
  • This work instruction applies to the audit of both commercial and custom software developers.
  • The auditor is responsible for completing the checklist based on the audit that is conducted.
  • The depth of auditing ought to depend on the risk associated with the system.

It Provides information on:

  • RESPONSIBILITIES
  • METHOD
  • QUALITY RECORDS
  • Audit information
    • Established quality system
    • Planning the system
    • Define requirements
    • Select team and vendors
    • System design
    • Software development/coding
Customer Testimonials
This product hasn't been reviewed yet.
Review this product
 
 Member Service
 
Call  +1-650-620-3937
Fax  +1-650-963-2556
Email  editor@complianceonline.com
 
 Your Shopping Cart
Contains 0 items    Total: $0.00
Customers Also Bought
Digital audio tape recorder reel to reel system, using 6,3 mm magnetic tape, for professional use - Part 1: General requirements
Price: $56
 
Digital audio tape recorder reel to reel system, using 6.3 mm magnetic tape, for professional use - Part 2: Format A
Price: $97
 
Digital audio tape recorder reel to reel system, using 6.3 mm magnetic tape, for professional use - Part 3: Format B
Price: $97
 
Digital audio tape recorder reel-to-reel system, using 6,3 mm magnetic tape, for professional use - Part 4: Magnetic tape properties: definitions and methods of measurement
Price: $61
 
Digital audio tape recorder reel-to-reel system, using 6,3 mm magnetic tape, for professional use - Part 5: Reels
Price: $36
 
Electrical measuring instruments - X-t recorders - Part 1: Definitions and requirements
Price: $148
 
Related Trainings
ISO 9001:2000 1st, 2nd and 3rd Party Auditing & Implementation
 
Understanding the ISO 9001:2000 Process Approach to Implementation
 
ISO 9000, TQM, Six Sigma & Lean Enterprise- Tying Them Together for an Effective...
 
ISO 9001: 2000 Made Easy
 
Products from the same family
Guidance on Validation Activities for Systems at the Low-, Moderate-, and High-Risk Levels (RiskVal)
Price: $150
 
Risk Management Policy (RiskVal)
Price: $99
 
Life Cycle for the Selection, Implementation, Validation and Use of Computer Systems (RiskVal Life Cycle)
Price: $49
 
Requirements for Computer System Requirements, Validation Plans, Protocols and Reports (RiskVal)
Price: $99
 
Change Control for Validated Systems (RiskVal)
Price: $125