ESTIMATING THE FIRST MELTING TEMPERATURE OF FIRESIDE DEPOSITS IN RECOVERY BOILERS
Provider: TAPPI
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price:
$35.00
Product Details
- The first melting temperature (FMT) of fireside deposits is important in recovery boiler operation. Corrosion of superheater tubes occurs rapidly if tube surface temperatures exceed the FMT of the deposits on the tubes.
- This TIP summarizes available information on the effects of deposit composition on FMT, and shows how to estimate the FMT based on deposit composition.
- This TIP summarizes available information on the effect of composition on the FMT, and shows how to estimate the FMT from deposit composition.
It Provides information on:
- Scope.
- Content.
- Keywords.
It Benefits:
- Engineer.
- Laboratory Personal.
- Analyst.
- Researchers.
Customers Also Bought
- Belt Bucket Elevator Design - SECOND EDITION
Price: $19.99 BUY NOW - Belt Bucket Elevator Design
Price: $15 BUY NOW - Bulk Material Handling Introduction.
Price: $12.5 BUY NOW - CMMS Secrets
Price: $12.5 BUY NOW - Dust Control Equipment & Methods
Price: $12.5 BUY NOW - Electric Motors in Use
Price: $12.5 BUY NOW
You Recently Viewed







